Leicester Data Centre (DC4)

A Tier 2 Facility

Strategic Location and Robust Infrastructure

Our Leicester Data Centre (DC4) is a 620m² purpose-built, Tier 2 facility providing reliable, high-performance infrastructure for businesses across the East Midlands and the UK.

Located less than two miles from Leicester’s city centre, and just over a mile from Leicester train station, DC4 offers exceptional accessibility whilst delivering top-tier security and operational resilience. 

Key Highlights 

  • Prime Location and Accessibility: Just a short drive from the M1 and close to Leicester city centre, DC4 is optimally positioned for easy access while offering a secure, discreet location.
  • Power and Backup: Operating with an 11,000-volt power supply, dual 500kVA UPS systems, and a 1MVA generator, the site ensures power continuity with 24-hour backup capacity.
  • 24/7 Monitoring and On-Call Support: Manned by dedicated staff during business hours, DC4 offers 24x7x365 on-call support through our Nottingham Data Centre and the UK-wide NOC in Glasgow. 

  • 2 x Diverse fibre entry points into the Data Centre via multiple carriers 
  • Cross Connection to several Tier 1 carriers 
  • Direct peering interconnection to London LINX, Telehouse and Equinix facilities 
  • Truncated internal cable network 
  • ODF / DDF (Optical Distribution Frame / Digital Distribution Frame) bandwidth 
  • Internal inventory systems track all cables, circuits and cross-connects 
  • Scalable architecture including multiple redundant core switches and routers

  • 1MVA 11000volt power supply into the site 
  • 1 x 1MVA generator 
  • 2 x 500kVA UPS plus battery backup systems 
  • Generator can operate on full occupancy for an initial 24 hours 
  • Fuel replacement contract with multiple suppliers delivering a 10-hour SLA 
  • PUE – 1.8

  • N+1 redundant Computer Room Air Conditioning (CRAC) system 
  • Fully redundant air handling units provide constant fresh airflow 
  • 1.50kW/m² cooling density 
  • Controlled Environment – room temperature 24°C +/- 2°C

  • BT 
  • CenturyLink 
  • VirginMedia 
  • Vodafone (Cable and Wireless) 
  • Zayo

  • 2 plus staff on site during key working hours
  • Out of hours –on call arrangement via the Nottingham Data Centre support team supported by Group UK-wide NOC in Glasgow

  • No external indication of the use of the facility 
  • Access controls at all access points 
  • Data hall access requires both Swipe Card and PIN entry 
  • Internal and external CCTV systems – 90 days recording in line with PCI DSS 
  • Security breach alarms 
  • Dual zone fire detection equipped with FM200 gas suppression system 
  • Double knock system which ensures that it takes 2 alerts to trigger activation 
  • Fire alarm buttons are located at each access and egress point 
  • Activation does not affect critical power to the data halls 
  • Under floor leak detection

Our Leicester Data Centre Certifications

Ready for Reliable Infrastructure?

Learn more about our reliable infrastructure in the East Midlands.